Digisol DG-GS4628E2 Instrukcja instalacji - Strona 14
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Przełącznik Digisol DG-GS4628E2. Digisol DG-GS4628E2 19 stron. Giga layer 2 switches
2.2 Installation Preparation
2.2.1 Verify the Package Contents
First, open the package, please check the contents of the switch container and
accessory kit. (If you are concerned that any item is missing or an incorrect item has been
supplied, please contact your dealer as soon as possible.)
2.2.2 Required Tools and Materials
The required tools and utilities are shown below:
Cross screwdrivers
Flat-blade screwdriver
ESD wrist strap
Antistatic uniform
Caution!
Users should prepare the required tools by themselves.
2.3 Installation Guide
2.3.1 Installing the Switch
Please mount the switch as below:
1. Attach the 2 brackets on the switch with screws provided in the accessory kit.
2. Put the bracket-mounted switch smoothly into a standard 19'' rack. Fasten the
switch to the rack with the screws provided. Leave enough space around the switch for
Fig 2-1 Fasten the Brackets to the Switch
2-6
DG-GS4200 Installation Guide