Cisco ONS 15454 Instrukcja instalacji - Strona 19

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Serwer Cisco ONS 15454. Cisco ONS 15454 22 stron. Four-shelf and zero-shelf bay assembly
Również dla Cisco ONS 15454: Instalacja (32 strony), Instalacja (32 strony), Rozpakowywanie i instalacja (42 strony), Rozpakowywanie i instalacja (40 strony)

Cisco ONS 15454 Instrukcja instalacji
Chapter 2 Install Cards and Fiber-Optic Cable
Table 2-5
Card
OC192/STM64 Any Reach
(ONS-XC-10G-I2)
OC192/STM64 Any Reach
(ONS-XC-10G-L2)
Step 2
As needed, complete the
page
As needed, complete the
Step 3
page
As needed, complete the
Step 4
on page
As needed, complete the
Step 5
page
Continue with the
Step 6
Stop. You have completed this procedure.
NTP-A245 Route Fiber-Optic Cables
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
As needed, complete the
for all OC-N cards except the OC-192,OC192SR1/STM64IO Short Reach and OC192/STM64 Any
Reach (OC192-XFP), and OC-48 AS cards.
Open the fold-down front door on the cable-management tray.
Step 2
Route the fiber-optic cable on the card faceplate through the fiber clip on the faceplate, if provided.
Step 3
Step 4
If you installed a 15454_MRC-12 card, complete the
15454_MRC-12 Cards" task on page
cards except the 15454_MRC-12 cards. The 15454_MRC-12 cards are shipped with two versions of a
fiber clip that plug into the faceplate.
Route the fiber-optic cables into the cable-management tray.
Step 5
78-17697-01
Optical Card Transmit and Receive Levels (continued)
"DLP-A207 Install Fiber-Optic Cables on the LGX Interface" task on
19-5.
"DLP-A428 Install Fiber-Optic Cables in a 1+1 Configuration" task on
21-8.
"DLP-A43 Install Fiber-Optic Cables for Path Protection Configurations" task
17-44.
"DLP-A44 Install Fiber-Optic Cables for BLSR Configurations" task on
17-47.
"NTP-A245 Route Fiber-Optic Cables" procedure on page
This procedure describes how to route fiber-optic cables away from the
ONS 15454 shelf, including installing fiber boots and fiber clips.
None
NTP-A247 Install Fiber-Optic Cables, page 2-16
As needed
Onsite
None
"DLP-A45 Install the Fiber Boot" task on page
Transmit
Receive
Minimum Maximum
Minimum
–1 dBm
2 dBm
–14 dBm
0 dBm
4 dBm
–24 dBm
"DLP-A443 Install the Fiber Clip on
21-25. Fiber clips are factory-attached to the faceplate of optical
Cisco ONS 15454 Procedure Guide, R8.0
NTP- A245 Route Fiber-Optic Cables
Maximum
2 dBm
–7dBm
2-19.
17-49. Fiber boots are required
2-19