Acuity Brands Lighting HYDREL Instrukcje instalacji - Strona 4

Przeglądaj online lub pobierz pdf Instrukcje instalacji dla Światło powodziowe Acuity Brands Lighting HYDREL. Acuity Brands Lighting HYDREL 4 stron.

iNSTALLATiON iNSTRUCTiONS
WARNiNG:
FAILURE TO FOLLOW THESE INSTRUCTIONS AND WARNINGS MAY RESULT IN DEATH, INJURY OR SIGNIFICANT PROPERTY DAMAGE
For your protection, read and follow these warnings and instructions carefully before installing this fixture. These instructions do not attempt to cover all installation
situations. If you do not understand these instructions or additional information is required, contact Hydrel Lighting or your local Hydrel Lighting distributor.
Fixture to BPCA/BPCB Polymeric Ground Box Connection
1)
Route fixture cord along fixture and secure with provided Wire Keepers (I).
Trim excess cord at BPCA/BPCB, strip back jacket approximately 4", and slide through ½" Cord Seal (K) provided.
2)
a. Note: BPCA/BPCB must be ordered with ½" NPT at location "M" for use with Rhythm Fixtures.
3)
Make electrical load connections as indicated on the labeled conductors and per all NEC and local code
requirements.
I
Wire Keepers
K
Cord Seal
BPCA/BPCB
I
6" Min
Concrete Pedestal
(2 Places - RHY 2, 3, 4)
9144 Deering Avenue | Chatsworth, CA 91311 | www.hydrel.com
Phone: 866.533.9901 | Fax: 866.533.5291
RHYTHM SERiES
Installation should be performed by a qualified
electrician in accordance with the National Electrical Code
and relevant local codes.
K
Location M
6" Min
Above Grade
©2014 Acuity Brands Lighting, Inc.
7/29/14
INS-RHYTHM