DISCOVER 950-0025 Podręcznik użytkownika - Strona 14

Przeglądaj online lub pobierz pdf Podręcznik użytkownika dla Gateway DISCOVER 950-0025. DISCOVER 950-0025 18 stron. Sma sunny island

DISCOVER 950-0025 Podręcznik użytkownika
4. Connect the LYNK II Communication Gateway, open the LYNK ACCESS software,
and click the LYNK tab.
5. Select the blue gear icon in the upper right area of the CAN Settings tile.
6. Select the pre-configured SMA protocol to complete the closed-loop
configuration for LYNK II. Click SAVE to confirm the configuration.
• Saving configuration changes using LYNK ACCESS will automatically cause the LYNK
II Communication Gateway to shut down and restart.

7. CONFIGURING SUNNY ISLAND

7.1 Setting Up Sunny Island 4548-US and 6048-US

Before connecting LYNK II to the Sunny Island network, update the firmware on
Sunny Island 4548-US and 6048-US to version 7 .3 or later.
The following instructions are for a system with a single Sunny Island in an off-grid
application. Refer to the Sunny Island Manual to install a system with multiple
Sunny Island inverters.
After installing the batteries described in the Discover Battery manual, follow the
SMA Quick Configuration Guide (QCG) instructions to set up the Sunny Island for
use with Discover Lithium batteries.
1. Switch the DC circuit breaker of the Sunny Island from OFF to ON.
2. Sunny Island will initiate the startup phase and displays several notifications. 'To
init system' is the last notification.
3. Press and hold down <ENTER> until the Sunny Island beeps three times to start
the QCG setup.
4. Set the parameters for Discover Lithium batteries.
When replacing batteries with Discover Lithium batteries in an existing SI
system, select 'New Battery.'
When commissioning a 'New System,' wait until prompted to enter battery
parameters.
NOTE
OFF
OFF
DC-Disconnect
To init system
hold <Enter>
STNDBY: to Start
INV hold <ENTER>
14