Akw Arka Thermostatic Cool Touch TMV2 Manual de instruções de instalação - Página 4
Procurar online ou descarregar pdf Manual de instruções de instalação para Produto de canalização Akw Arka Thermostatic Cool Touch TMV2. Akw Arka Thermostatic Cool Touch TMV2 12 páginas. Mixer shower
installation
Installing the Fast Fit Kit
1. identify all components are present prior to
starting installation.
2. mark the position for the pipework and the
fixings supplied.
note: the pipe centres required for this
thermostatic mixing valve are 150 mm.
Before drilling into walls, check that there are
no hidden electrical wires, cables, or water
supply pipes. this can be done with the aid
of an electronic detector.
3. Drill suitable holes in the wall surface at the
marked positions to accommodate the supply
pipework and fixings.
4. terminate the pipework in the wall, ensuring
that there is at least 30 mm of 15 mm diameter
pipework protruding from the finished wall surface.
Important
match up the water supply pipes with the
thermostatic mixer valve. the must be with the hot
on the left and the cold on the right when viewed from
the front.
5. place the inlet cover (1) over the supply pipe.
Use the wall plugs (2) and screws (3) provided
to fix the wall plates to the wall.
6. place the olive (4) onto the protruding
pipework. impoRtant: the pipework must not
protrude past the olive (4) by more than 5 mm.
7. Screw 1/2" - 3/4" BSP fitting (5) onto the wall
plate (1) using a 24 mm spanner. Repeat this
step on the other side.
8. Screw the covers (6) over the wall plates /
1/2" - 3/4" BSP fittings (5) so that they are flush
against the finished wall surface.
4
150 mm Centres
1
3
3
1
4
5
5
6
General: 01905 823 298
30 mm
2
|
www.akw-ltd.co.uk