Astronergy CHSM6612M Manual de instalação - Página 9
Procurar online ou descarregar pdf Manual de instalação para Equipamento industrial Astronergy CHSM6612M. Astronergy CHSM6612M 12 páginas. Crystalline silicon pv
Também para Astronergy CHSM6612M: Manual de instalação (10 páginas), Manual de instalação (12 páginas), Manual de instalação (18 páginas), Manual de instalação (19 páginas), Manual (19 páginas)

f)
Especially for Figure e & Figure g mounting method, the modules may be mounted using
clamps designed for solar modules refer to Figure j, the modules must be supported along
the length of the edge, and should overlap the array rail by 10mm – 14mm
g) Especially for Figure f & Figure g mounting method: the recommended mechanical load on
panels is less than 2400Pa, and this method is only suitable for 45mm frame module series.
4
Electrical Installation
4.1 Installation Condition
4.1.1 The electrical characteristics are within ±10% of the indicated values of I
under the standard test conditions (irradiance of 1000 W/m
Chint Solar (Zhejiang) Co., Ltd. | Add:1335 Bin´an Road, Binjiang District, Hangzhou | P.C: 310053
Tel: 0086-571-5603 1888 | Fax: 086-571-5603 2316 | Website: http://energy.chint.com/
Figure h
Figure i
Figure j
Figure k
2
. V
and P
sc
oc
, AM1.5 spectrum, cell
mpp