For operators: maintenance

Inspect and maintain your system to:
keep it safe and reliable,
-
achieve top output,
-
prevent damage and,
-
protect your investment.
-
aleo solar recommends carrying out regular inspections and
maintenance so that any problems can be discovered reliably, and
rectified.
RECOMMENDATION
 aleo solar explicitly recommends annual inspections and a more
thorough inspection and measurement every 4 years.
 We also recommend the use of a monitoring system to identify
any outages or problems quickly.
 Inspecting the output of your photovoltaic system regularly can
help to discover problems promptly, and ensures your photo-
voltaic system operates at top performance, preventing loss of
output.
 For the proper maintenance and repair of your aleo solar pho-
tovoltaic system, contact your aleo solar dealer or get in touch
with aleo solar directly (see chap. 2.2: „Contact").
11.1

Inspection

aleo solar recommends an inspection every year. This should be a
visual inspection. Refer to chap. 11.3: „Details for the inspections".
The inspection includes the following aspects:
11.1.1 Inspection of the generator
 strings: condition of the insulation and mounting,
 condition of the junction box,
 condition of the visible connectors,
 condition of the earthing conductors,
 for direct earthing: connection of the earthing conductors on
the frames,
 for indirect earthing: connection of the frames to the sub-
structure and the earthing conductors to the sub-structure,
 condition of the mounting system (in peripheral area),
 dirt on modules: type and degree of dirt. Clean the compo-
nents, if necessary.
 shade circumstances (e.g. from trees or neighbouring houses).
aleo solar GmbH | Marius-Eriksen-Straße 1 | 17291 Prenzlau | Germany |
11.1.2 Inspection of the documentation and drawings
 check the module string plan,
 check the inverter's status reports,
 determine and archive the annual output,
 create and archive the inspection report.
11.2
aleo solar recommends carrying out a thorough review at least
every 4 years. This includes the following work in addition to the
inspection:
measure the characteristics of individual strings (MPP current:
I
measure the insulation resistance: R
evaluate the annual power output and compare the data with
earlier readings,
create and archive a review report.
11.3
11.3.1 Mechanical inspection
 Safety precautions:
 Work steps:
11.3.2 Electrical inspection
 Safety precautions:
 Work steps:
11.4
Depending on the ambient conditions, modules are likely to get
soiled more or less heavily over time. This can cause reduced out-
put.
Dirt could be:
-
-
-
-
-
Suggestion for external inspectors: perform a spot check to ensure that
7
the module string plan matches the installation.
According to the standard IEC 61215, a photovoltaic module should have
8
an insulation resistance of at least 40 MΩ/m
9
Some inverters provide the measured insulation resistance via an inter-
face.

Review

; open-circuit voltage: U
MPP
OC

Details for the inspections

Refer to the notes in chap. 6.2.2: „Mechanical safety precau-
tions".
During the inspection, check that the mechanical connections
are clean, securely fitted and properly intact.
Make sure you refer to the notes in chap. 6.2.1: „Electrical
safety precautions".
During the inspection, check that the electrical connections
are clean, securely fitted and properly intact.
Identify any defects or irregularities in the electrical instal-
lation and make a record of them. Then rectify the problem
as quickly as possible.

Cleaning

dust, pollen or seed;
leaves or twigs;
deposits from stable vapour;
moss, algae, fungi or bacteria growing on deposits (in
short: biofilms);
salt (in coastal regions).