ATILA Powergene Power96-2 Manual do utilizador - Página 7

Procurar online ou descarregar pdf Manual do utilizador para Equipamento de laboratório ATILA Powergene Power96-2. ATILA Powergene Power96-2 14 páginas. Real-time pcr systems

2.

Installation and Setup

2.1 System Placement

WARNING: Excessive Weight Hazard
can result in system damage and personal injury.
As with all electrical instruments, the Atila Powergene should be located away from water, solvents, or
corrosive materials, on a flat and stable surface with adequate clearance on all sides. The system must
remain stationary during operation.
The system should be placed away from interfering electrical signals and magnetic fields. If possible, a
dedicated electrical outlet should be used to eliminate electrical interference from other instrumentation in
your laboratory.
The Atila Powergeneshould be installed at no more than 3000 meters above sea level.

2.2 Connecting to Power

The power entry module is located in the lower right on the back panel of the system.
Connect the power cord to a secure power outlet.
It is important to connect the system to a well-grounded power source. Atila
Biosystems recommends that you employ a surge protecting power strip to
protect against unexpected power surges that may cause damage to the
electrical components.

2.3 Turning the System On/Off

The main power switch is located at the back panel, next to the power cord.
1.
First, flip the power switch to On (l).
2.
To wake the integrated computer, press the power button on the front of the system
and hold for 3 seconds. The machine will signal it is powering on with a loud beep
noise. The power button on the front of the system will light up green when the
system is on.
3.
To turn off the system, hold the power button on the front for 5 seconds until the
device powers off, then flip the power switch on the back to off.
Atila Biosystems recommends leaving the system on during working hours.

2.4 Software Installation

The Atila Powergene Device software is pre-installed. Once the system is done initializing, the software
displays and is ready to use.
Please contact Atila Technical support at
the software.
Atila Powergene Real-Time PCR Systems User Manual
– Please use two or more people to lift the system. Failure to do so
for questions about updating
Page 3