Anzzi CHAND 2344311 Manual de instalação e operação - Página 7

Procurar online ou descarregar pdf Manual de instalação e operação para Banheiras Anzzi CHAND 2344311. Anzzi CHAND 2344311 12 páginas. Soaking freestanding bathtub

Anzzi CHAND 2344311 Manual de instalação e operação
* All CHAND bathtubs are 100% water tested at the factory and certified to be free
of leaks. T ransportation and mishandling may cause leaks. It is necessary to test the
bathtub while there is access to all sides of the bathtub.
TEST THE BATHTUB WHILE YOU HAVE ACCESS TO THE
BOTTOM AND BEFORE PERMANENTLY INSTALLED.
READ AND FOLLOW ALL INSTRUCTIONS
Place the tub on a completely flat surface in an area where it may be drained after testing.
Close the drain and fill the tub about half way.
Allow the water to stand in tub for 30 minutes and then inspect all plumbing and seals for leaks.
Have questions? Call us at
1-844-44-ANZZI
or visit us at
www.ANZZI.com
7