Gage Bilt GB128 Series Manual de instruções original - Página 7

Procurar online ou descarregar pdf Manual de instruções original para Ferramentas Gage Bilt GB128 Series. Gage Bilt GB128 Series 16 páginas. 20v battery installation tool

Gage Bilt GB128 Series Manual de instruções original

PRINCIPLE OF OPERATION

When the battery is connected to the tool, operation is controlled by a actuator to the motor. The GB128 incorporates an electronic
actuator assembly to send a signal to the motor. When the actuator assembly is depressed, the gear on the motor spins the gear on
the gear box assy retracting the nose assembly collet. This action causes the jaws to clamp on the fastener pintail and pull the sheets
together. Further force breaks the pintail off. When the actuator is released, the tool moves back to its starting position. The spent
pintail is released and drops out the back of the tool.
Image may not reflect actual tool
#
6/21
GB128 20V BATTERY INSTALLATION TOOL