Automationdirect.com Productivity 1000 P1-04ADL-2 Manual - Página 5

Procurar online ou descarregar pdf Manual para Sistemas de E/S Automationdirect.com Productivity 1000 P1-04ADL-2. Automationdirect.com Productivity 1000 P1-04ADL-2 8 páginas. Analog input

Automationdirect.com Productivity 1000 P1-04ADL-2 Manual

Wiring Options

1
ZIPLink Feed Through Modules and Cables¹
ZL-RTB20-1
ZL-RTB20
2
Terminal Block with pigtail cable
3
Screw Terminal Block only
4
Spring Clamp Terminal Block only
5
Accessories²
1.Cable + ZIPLink Module = Complete System
2. ZL-RTB-COM provides a common connection point for power or ground
Sales 800-633-0405
ZL-RTB20
ZL-RTB20-1
0.5 m (1.6 ft) cable
ZL-P1-CBL10
1.0 m (3.3 ft) cable
ZL-P1-CBL10-1
2.0 m (6.6 ft) cable
ZL-P1-CBL10-2
1.0 m (3.3 ft) cable
ZL-P1-CBL10-1P
ZL-P1-CBL10-2P
2.0 m (6.6 ft) cable
P1-10RTB
(Quantity 1)
P1-10RTB-1
(Quantity 1)
ZL-RTB-COM
TW-SD-SL-1
TW-SD-MSL-1

Module Configuration

Using the Hardware Configuration tool in
the Productivity Suite programming software,
drag and drop the P1-04ADL-2 module into the
configuration.
If desired, assign a User Tagname to each
input point (channel) selected and to each
Status Bit Item.
13
www.productivity1000.com
5