Dell Force10 S2410-01-10GE-24P Manual de início rápido - Página 8

Procurar online ou descarregar pdf Manual de início rápido para Servidor Dell Force10 S2410-01-10GE-24P. Dell Force10 S2410-01-10GE-24P 31 páginas. Installing the s2410 system
Também para Dell Force10 S2410-01-10GE-24P: Nota de aplicação (6 páginas), Manual (42 páginas)

Dell Force10 S2410-01-10GE-24P Manual de início rápido
Attaching Mounting Brackets
S2410 systems have no stacking or other optional modules, so, to install the
S2410 system, you can simply install the system on a tabletop, in a rack, or in a
cabinet, turn it on, and then connect ports.
The S2410 is shipped with two universal front-mounting brackets (rack ears),
which are contained in a bag with 3 Phillips screws for each rack ear.
.
Step
Task
Take the brackets and screws out of their packaging.
1
Attach the ears to the front corners of the switch.
2
Installing on Rack
Ensure that your equipment rack is earth ground. The equipment rack must be
grounded to the same ground point used by the power service in your area. The
ground path must be permanent.
4
Installing the Hardware
CAUTION: Use only the supplied screws for attaching the
rack ears. Longer screws might compromise the electronics.
Shorter or weaker screws might not adequately support the
S2410.