Dell Networking S6000 System Manual de iniciação - Página 20

Procurar online ou descarregar pdf Manual de iniciação para Interruptor Dell Networking S6000 System. Dell Networking S6000 System 37 páginas. Dell networking s6000 high-performance 10/40 gbe top-of-rack switch
Também para Dell Networking S6000 System: Relatório de teste (19 páginas)

Dell Networking S6000 System Manual de iniciação
Elevated ambient temperature — If installed in a closed rack assembly, the
operating temperature of the rack environment may be greater than the room
ambient temperature. Use care not to exceed the 40°C maximum ambient
temperature of the switch.
Reduced air flow — Install the equipment in the rack so that the amount of
airflow required for safe operation of the equipment is not compromised.
Reliable earthing — Maintain reliable earthing of rack-mounted equipment.
Pay particular attention to the supply connections other than the direct
connections to the branch circuit; for example, use of power strips.
Do not mount the equipment with the rear panel facing in the downward
position.

Installing the Dell ReadyRails System

The ReadyRails rack mounting system is provided to easily configure your rack
for installation of your switch. You can install the ReadyRails system using the
1U tool-less method or one of three possible 1U tooled methods (two-post flush
mount, two-post center mount, or four-post threaded).
1U Tool-less Configuration (Four-Post Square Hole or Unthreaded Round Hole):
1 With the ReadyRails flange ears facing outward, place one rail between the
left and right vertical posts. Align and seat the rear flange rail pegs in the rear
vertical post flange. In
the square and unthreaded round holes.
16
Installation
Figure
4-1, item 1 shows how the pegs appear in both