Dell S25N Manual de início rápido - Página 18
Procurar online ou descarregar pdf Manual de início rápido para Interruptor Dell S25N. Dell S25N 27 páginas.
Step
Task
Install the RJ-45 copper cable that is shipped with the system into the console
1
port.
CAUTION: You must install a straight-through RJ-45 copper cable
(a standard Ethernet cable) into the console port. This is different from
many other implementations that require an Ethernet crossover cable (or
rollover cable). If connecting to a terminal server and using a crossover
cable, daisychain another crossover cable to effectively get a straight-
through cable connection. Many console terminal servers use octopus
cables that are crossover cables. To accommodate the octopus cable,
connect an additional crossover cable, as above, to effectively install a
straight-through cable.
If necessary, connect the RJ-45/DB-9 adapter that is shipped with the system to
2
the end of the RJ-45 cable that will connect to your terminal.
16
Installing the Software