Epson L200 Manual de serviço - Página 27

Procurar online ou descarregar pdf Manual de serviço para Impressora tudo em um Epson L200. Epson L200 47 páginas. Color inkjet printer
Também para Epson L200: Especificações (4 páginas), Manual do utilizador (4 páginas), Instruções (4 páginas), Começar aqui (2 páginas), Manual do utilizador (2 páginas), Avisos e garantia (12 páginas)

Epson L200 Manual de serviço
L200/L201/L100/L101
Right Cover / Left Cover / Bottom Cover
Right Cover
The figures above indicate the hooks and ribs that secure the parts.
Ink Tubes
Ink Tube Guide 1st
Left side
Acetate tape (18 mm x 50 mm)
When installing the Ink Tube Guide 1st, align the blue lines of the ink tubes (the red lines for L100/L101) in the same direction as shown in the
figure above, and be careful not to let the ink tubes go slack on the bottom of the Ink Tube Guide 1st.
After securing the Ink Tube Guide 1st, pull the ink tubes from the Ink Supply Tank Assy side to make sure that the ink tubes are not caught.
Attach acetate tape (x2) in the positions shown above to secure the Ink Tube Guide 1st.
Disassembly/Assembly
Left Cover
Bottom Cover
Ink Tube Guide 1st
Ink Tube Guide 1st
Ink Tube Guide 1st
Front side
Acetate tape (18 mm x 50 mm)
C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm)
Details of Disassembling/Reassembling by Parts/Unit
CR Front
1
Carriage
C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm)
Hook
Align the positioning holes (x2) of the CR Front with the
Rib
dowels (x2) of the Carriage.
Tighten the screws in the order indicated in the figure above.
Ink Tubes
Bottom left
Align the ribs on the left/right side of the Ink Tube Guide 2nd with the frame as shown in the figure above.
Attach acetate tape in the position shown above to secure the Ink Tube Guide 2nd.
Tighten the screws of the Ink Tube Guide 2nd together with the EJ Frame Assy in the order indicated in the figure above.
2
C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm)
CR Front
Positioning Hole and Dowel
Tighten the screws in the order indicated in the figure above.
After installing the CR Cover, move the Carriage from side to
side to make sure that the Tube Assy does not apply extra load
of carriage movement.
Ink Tube Guide 2nd / EJ Frame Assy
EJ Frame Assy
2
1
Ink Tube Guide 2nd
Bottom right
Acetate tape (18 mm x 30 mm)
Revision A
CR Cover
CR Cover
1
2
Carriage
Tube Assy
Rib
C.B.P-TITE SCREW 3x10 (5.0 ± 0.5 kgf·cm)
27
Confidential