Cisco UCS X10c Manual de instalação e serviço - Página 21
Procurar online ou descarregar pdf Manual de instalação e serviço para Hardware de rede Cisco UCS X10c. Cisco UCS X10c 38 páginas. Front mezzanine gpu module
Servicing the GPU Module
3
If you are removing the entire GPU cage, be aware of the following considerations.
Note
If you are removing or installing the GPU cards themselves, these considerations do not apply.
• Each GPU slot has an MCIO cable. One end of the cable connects to the GPU cage, and the other end
connects to a socket on the mezzanine PCB.
• The slots on the Front mezzanine GPU module numbered 1 or 2. Although cables and connectors are
not labeled, you can use these slot numbers to help identify which cable must be connected to which
front mezzanine slot.
• Cables are not labeled, so make sure that you don't mix up the connections, such as connect the cable
for slot 2 to slot 1.
• Before disconnecting cables, you will find it helpful to mark which cable connects to GPU 1 and which
cable connects to GPU 2.
• If you are working with both GPU cables, do the following to allow more room for your fingers:
• When you are installing cables, make sure that you route them so that they do not pinch, bind, or interfere
with the removal or installation of other parts.
• When installing a GPU cage, always connect the GPU-cage end of the cable first, then connect the
mezzanine PCB-end of the cable.
• When removing a GPU cage, always disconnect the PCB-end of the cable first before detaching the
GPU-cage end of the cable.
• In most cases, you can leave the cables connected at the front mezzanine end and disconnect cables from
just the GPU end. However, if you must disconnect the front mezzanine end of the cable, the MCIO
connectors are labeled on the front mezzanine PCB to help identify how to reconnect the cables.
MCIO cable and
connector, GPU cage end
This cable connects to
front Mezzanine GPU
Module Slot 2
Note
The GPU card slots are also numbered 1 or 2.
• Disconnect slot 2's cable first, then slot 1's cable.
• Connect slot 1's cable first, then slot 2's cable.
Cisco UCS X10c Front Mezzanine GPU Module Installation and Service Guide
4
MCIO cable, front
mezzanine PCB end.
Cabling Considerations
13