Aries FilterWorks HPL-RO Manual de instalação e serviço - Página 5

Procurar online ou descarregar pdf Manual de instalação e serviço para Sistemas de filtragem de água Aries FilterWorks HPL-RO. Aries FilterWorks HPL-RO 7 páginas. Reverse osmosis system

Activating the System for the First Time:
RO system must be properly flush prior to commissioning. A temporary line is required from the
storage tank to a drain or sink. Do not connect this line to the Aries Unit until the flush steps
have been complete.
DO NOT USE THE FIRST TWO RESERVOIRS OF WATER.
1. Make sure all water supply / drain lines are secure and free from leakage
2. Slowly open isolation valve on the inlet of the RO system. Check for leaks.
3. Open the storage tank valve.
4. While the final product valve is closed, allow the Storage tank to fill completely (this
should take about 4-6 hours). The concentrate flow to drain will stop when the tank is
full.
5. Dispense all of the water in the system to drain. This process removes the factory
installed sanitizing solution from the entire system and sends it to drain. Repeat this
process one more time. Allow the tank to fill for 4-6 hours and dispense to drain.
6. Connect the dedicated final product line to the Aries Filterworks HP unit for system
commissioning.
Maintenance:
Routine maintenance is essential to the longevity and performance of the system. Filters
should be changed quarterly and the RO membrane every six to twelve months depending on
the water quality.
Note that filters are labeled for easy servicing
1. Close the RO feed supply and Aries Filterworks HP valves. Close storage tank isolation
valve.
2. Using spanner wrench, remove 5 micron, GAC, and 1 micron filters. Replace with
cartridge kit AFK-005. Check o-ring seals to see if lubricant is needed. Use a silicone
based – petroleum free grease. Reassemble bowls. Avoid over-tightening.
3. If membrane replacement is required – proceed to the next step. Otherwise, turn open
isolation valves and inspect for leaks.
4. For membrane replacement, remove membrane feed line and unscrew housing cap.
Remove membrane from housing (pliers may be required). Install membrane (part
number AM-12-7010), screw on cap, and reconnect hose.
5. Open sample /drain valve upstream of Aries Filterworks system. Open RO Feed valve
and flush membrane for 4-6 hours to remove sanitant.
6. After system flush, close sample / drain valve and open storage tank and Aries
Filterworks valves.
M-0221201113
Revision 4
Page 5 of 7