ABB AutoLink Livro de instruções - Página 4

Procurar online ou descarregar pdf Livro de instruções para Dispositivo de proteção ABB AutoLink. ABB AutoLink 12 páginas. 15kv, 27kv, 38kv
Também para ABB AutoLink: Instruções de montagem (11 páginas)

ABB AutoLink Livro de instruções
TEHI95094 – Rev. 2

1. Introduction

This document contains the required information to install medium voltage AutoLink
Sectionalizer and put it into service.
For a correct use of the product, please read it carefully.
Like every apparatus we manufacture, AutoLink is designed for specific applications.
Use only original spare parts.
For further information, please read the technical catalogue.
All
maintenance operations must be carried out by suitably qualified
personnel with in-depth knowledge of the apparatus.

2. Packing and Transportation

The AutoLink Sectionalizer is shipped in cardboard package, in armed position.

3. Checking on Reception

Before carrying out any operation, always make sure that the
operating mechanism springs are charged and that the apparatus is in
armed position. When performing a reception test, it is required to
wait 5 minutes with the device de-energized after a tripping operation,
to reset it.
On reception, check the state of the apparatus, integrity of the packing and nameplate
information is the same requested on the purchase order specifications.
Make sure that all materials described in the shipping note are included in the supply.
If any damage or irregularity is seen in the supplied product after unboxing, notify ABB
(directly or through the agent or distributor) as soon as possible within five days of receipt.
The apparatus is only supplied with the accessories specified at the time of ordering and
validated in the order acknowledgement sent by ABB.
The documents sent in the shipping packing are:
-
Test Certification
-
Packing List
Other documents which are sent prior to shipment of the apparatus are:
-
Order acknowledgement
-
Original shipping advice notes
-
Any drawings or documents referring to special configurations/conditions
installation,
putting
into
service,
commissioning
4/ 12
and