ALUZ A1-ZIBI-STN-DWH Manual - Página 5
Procurar online ou descarregar pdf Manual para Equipamento de iluminação ALUZ A1-ZIBI-STN-DWH. ALUZ A1-ZIBI-STN-DWH 13 páginas.
1
Measure area where luminaire will be installed. Use a laser line to create
a reference line along installation area, ensuring consistent alignment of
mounting clips. Mark location where each mounting clip will be installed
along reference line.
2
Use 1 mounting clip every 2', rounded up. Use a minimum of 2 mounting clips
per luminaire segment. For vertical applications, create a stopper at the
bottom of the run to prevent sliding.
3
Space mounting clips evenly throughout the run.
Example: 20' Run.
8'
3" Gap
Mounting Clip
4
Insert stakes into ground until entire tapered portion is submerged.
Note: The ground must be able to support the weight of luminaires.
1170 N Red Gum St, Anaheim, CA 92806
aluz.lighting
© ALUZ All Rights Reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
A1 Series | Surface
ZIBI Standard Dynamic White
(A1-ZIBI-STN-DWH)
20'
8'
4'
Junction between luminaire segments
866.ALUZ.LTG | 714.535.7900
5
Ensure each stake is secured in place, then snap luminaires into
mounting clips.
6
If applicable, connect disconnects between luminaires. Slide
shrink tube over connectors and apply heat. The shrink tube will
shrink down, sealing the connectors. Apply silicone around sealed
connectors for a stronger seal.
Page 5 of 13
Stake Mounting Clip
Installation Instructions
9 / 11 / 2023 / Rev 4