Acqua SPRINT 1.5 Calendário de manutenção - Página 2
Procurar online ou descarregar pdf Calendário de manutenção para Equipamento para relva e jardim Acqua SPRINT 1.5. Acqua SPRINT 1.5 2 páginas. Surface-mounted aerator
Biennial (Two Yearly) Maintenance
Every two years it is important to inspect the primary and secondary seals, and the motor bearings for
wear. These need to be replaced if necessary. Please refer to Acqua & Co. Aeratore Sprint 1.5 hp 1
04/05 and Spare Parts List for reference as required.
a)
Perform the Annual (Yearly) Maintenance steps a) to c) as instructed.
b)
Separate motor housings (Part No. 16 & 17).
c)
Remove the rotor assembly (Part No. 1), complete with bearings (Part No. 28).
d)
Inspect the bearings (Part No. 28) for wear and damage. Replace as necessary.
e)
Reassemble motor housings, replacing O-ring (Part No. 50).
f)
Perform the Annual (Yearly) Maintenance steps d) to e) as instructed.
o
ed.
11/2006
Page 2 of 2