air choice BLF-YH05 Руководство пользователя - Страница 3
Просмотреть онлайн или скачать pdf Руководство пользователя для Вентилятор air choice BLF-YH05. air choice BLF-YH05 10 страниц. 2-in-1 tower fan
II. Circuit Diagram
TECHNICAL PARAMETERS
Model
Rated Voltage
BLF-YH05
AC120V
INSTALLATION
1. Open the packing box and place the product on a flat surface or table. Check whether all
pieces in the box are in line with the packing list or not.
2. Thread the power line into chassis, nut and machine engine and screw the nut clockwise
in place (the chassis dismantlement order is reverse to the above mentioned order)
according to the position (A-A) and (B-B). (As shown in Figure I) (It is not necessary to install
the chassis for BLF-YH05). Organize the power line and put it into the chassis trunking
according to its flat position direction. (Figure II)
Rated Frequency
60Hz
3
Rated Power
Control Type
50W
Electronic
Figure I