3.2 Utility (Commercial AC) Input Connections
(GROUND )
3.3 Inverter Input Connections
WARNING: Ensure that all DC input power is removed from the inverter system before beginning to
perform the maintenance bypass panel input connections. Serious injury or death could occur from
live AC circuits.
A. With the rear cover still removed, connect the output power from the inverter system to the
inverter input connections on the maintenance bypass panel as shown in Figure 3-4. Each input
connection is made via a compression screw. Maximum size cable is 6 GA.
3.4 AC Load Output Connections
WARNING: Ensure that all input power is removed from the maintenance bypass panel before
beginning to perform the load connections from the maintenance bypass panel. Serious injury or
death could occur from live AC circuits.
A. With the rear cover still removed, connect the LOAD (output power) from the maintenance
bypass panel to the load connections. Refer to Figure 3-5. Each LOAD output connection is made
via a compression screw. Maximum size cable is 350 MCM.
Page 13
© Copyright 2023 ABB. All rights reserved.
Figure 3-3: Commercial AC Input Connections (view from top)
Figure 3-4: Inverter Input Connections
827E MBS_MAN
(continued)
Rev. 2.4