Miele DDF 125 Руководство по установке - Страница 18

Просмотреть онлайн или скачать pdf Руководство по установке для Вентиляционная вытяжка Miele DDF 125. Miele DDF 125 28 страниц. External motor roof installation
Также для Miele DDF 125: Руководство по эксплуатации и установке (24 страниц), Инструкции по эксплуатации и установке (28 страниц)

Miele DDF 125 Руководство по установке
Installation
The ducting collar on the motor unit has
a diameter of 150 mm as standard.
If a diameter of 125 mm is required a
reducing collar must be used.
A reducing collar is available to order
from Miele or from your Miele supplier.
 Push the flexible ducting onto the
connection on the motor unit and
secure it with a hose clip.
 Ducting with a diameter of 150 mm is
then connected to the exhaust side.
If the exhaust air is to be ducted into
the open air, a telescopic wall vent kit
can be used. A telescopic wall vent kit
is available to order from Miele or from
your Miele supplier.
If the motor is installed vertically with
the exhaust ducting venting over a
roof, a roof vent kit DDF 125/150 or
similar measures must be used to
prevent the elements such as
rainwater or snow penetrating the
exhaust opening.
18
 Connect the control cable plug
connectors.
 Use the extension cable supplied to
lengthen the connection cable if
necessary.
 If equipotential bonding is required,
connect the earth cable to the
connection point provided  on the
casing.
Equipotential bonding is required if
the control cable is to be extended
by more than the length of the
extension cable supplied (see
"Electrical connection").