Digisol DG-GS4110 Руководство - Страница 4
Просмотреть онлайн или скачать pdf Руководство для Переключатель Digisol DG-GS4110. Digisol DG-GS4110 12 страниц. 8 port l2 gigabit ethernet web managed switch with 2 gigabit sfp ports
Также для Digisol DG-GS4110: Подключение и настройка (3 страниц)
Front Panel
PWR LED:The Power LED lights up when the Switch is connected to a power source.
Link/Act LED: The Link/Act LED flashes which indicate a network link through the corresponding
port. Blinking indicates that the Switch is either sending or receiving data to the port.
RST: Pressing the Reset button for 5 seconds the switch will change back to the default
Configuration and all changes will be lost.
Rear Panel
Grounding: use specialized ground lead connect.
Connect the power adapter output terminal to this port. Supports input voltages +44 ~ +57 VDC
Hardware installation
This chapter provides unpacking and installation information for the Web Managed Ethernet
switch.
First step: open a seal
Open the shipping carton and carefully unpack its contents. Please consult the packing list
located in the User Manual to make sure all items are present and not damaged.
Switch 1pcs
AC power cord 1pcs
Rubber feet 4pcs
Screws 6pcs
Mounting brackets 2pcs
CD 1pcs
If any item is found missing or damaged, please contact the local reseller for replacement.
Second step: switch installation
For safe switch installation and operation, it is recommended that you:
Visually inspect the power cord to see that it is secured fully to the AC power connector.
Make sure that there is proper heat dissipation and adequate ventilation around the switch.
Do not place heavy objects on the switch.