Astronergy CHSM6610P Kurulum Kılavuzu - Sayfa 7
Kontrol Ünitesi Astronergy CHSM6610P için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Astronergy CHSM6610P 12 sayfaları. Crystalline silicon pv
Ayrıca Astronergy CHSM6610P için: Kurulum Kılavuzu (10 sayfalar), Kurulum Kılavuzu (12 sayfalar), Kurulum Kılavuzu (18 sayfalar), Kurulum Kılavuzu (19 sayfalar), Manuel (19 sayfalar)

3.2.2 Clamping on the frame surface
3.2.2.1 Single glass module
Modules can be laid either across the supporting bars (Figure d & f)
Modules can be laid either across the supp
frame (Figure e & g).
Remark:
1) The length of supporting bars must
The length of supporting bars must be longer than the length of module frame, otherwise
please confirm with our product team to get approval.
please confirm with our product team to get approval.
Chint Solar (Zhejiang) Co., Ltd. | Add:1335 Bin´an Road,
Tel: 0086-571-5603 1888 | Fax: 086-571-5603 2316
on the frame surface
Fig d
Fig f
an Road, Binjiang District, Hangzhou | P.C: 310053
5603 2316 | Website: http://energy.chint.com/
Fig c
longer than the length of module frame, otherwise
or parallel to the edge of
Fig e
Fig g
Fig g