Follett EU155N Series Kurulum ve Servis Kılavuzu - Sayfa 7

Su Sebili Follett EU155N Series için çevrimiçi göz atın veya pdf Kurulum ve Servis Kılavuzu indirin. Follett EU155N Series 20 sayfaları. Ice and water dispensers
Ayrıca Follett EU155N Series için: Kurulum, Çalıştırma ve Servis Kılavuzu (20 sayfalar), Kurulum, Çalıştırma ve Servis Kılavuzu (20 sayfalar)

Installing EU155N dispenser in counter
All EU155N dispensers must be installed level in both directions and supported from
below with 153 – 229mm adjustable legs provided, or channels installed on site. DO
!
NOT hang dispenser on flange of counter.
1. Check that dispenser location meets all requirements in this manual and cut counter as shown.
2. Block up area below counter cut-out to support dispenser when lowered into place.
3. For automatic load dispensers, disconnect ice transport tube from bracket in storage area of dispenser.
(Since this tube must be reinstalled in bracket after dispenser is dropped into counter, note how tube is held
by bracket tabs before disconnecting.)
4. Carefully lower dispenser into counter until it rests on support blocks.
5. Adjust height from below with standard leg kit until dispenser flange rests flush with counter.
6. Apply a bead of NSF listed silicone sealant (Dow-Corning RTV-732 or equivalent) approximately 6mm in
diameter around perimeter of dispenser where it meets counter and smooth sealant to a 4mm radius.
7. Install a hard drain line, maintaining at least a 6mm per 304mm run slope, and insulate line to prevent
condensation.
PVC pipe is suggested. Care must be taken in sweating any metal drain pipe used.
!
Excessive heat applied while sweating metal pipe may melt plastic fitting on
dispenser.
8. Make electrical connections in accordance with applicable wiring diagrams provided, as well as NEC and
local codes. Provide disconnects within 3m of dispenser and icemaker for servicing.
Installation
Counter cut-out
(772mm)
+3mm
- 3mm
Front of counter
6
(667mm)
+3mm
- 3mm