Airwell X ARV Kurulum ve Bakım Kılavuzu - Sayfa 11
Klima Airwell X ARV için çevrimiçi göz atın veya pdf Kurulum ve Bakım Kılavuzu indirin. Airwell X ARV 20 sayfaları. Packaged air conditioners
UNIT LOCATION
The unit base shall be arranged as indicated in the manual. There could be a risk of personal injury
or damage to property in the event of the unit being incorrectly supported.
The unit must be installed on a firm level foundation, of adequate strength to support its full operating weight.
1. It must be high enough to permit good drainage of condensates with siphon
2. The unit must be pitched slightly towards condensate drain outlet to provide positive drainage of
condensates.
3. keep duct connections to a minimum to reduce duct losses.
4. When locating unit give consideration to, and locate unit as remote as possible minimise noise.
5. All electrical and ductwork connections to the unit must be made via flexible connections to prevent
transmission of vibration.
6. In addition to the service clearances noted on the dimension sheet it is essential that provision is
made for adequate and safe service access.
Before final installation of the unit mount the accessories (heater, rear or side air intake, plenum etc...). See the
specific document supplied with each accessory.
Remove the upper front panel, air intake panel and lower front panel according to the instructions.
²
REMOVAL OF UPPER FRONT PANEL A
(Access to the fan and the electrical heating or hot water battery (accessory))
Unscrew the two screws (a1 and a2), pull out and up.
²
REMOVAL OF FRONT AIR INTAKE B
Turn the two fasteners (b1 and b2) by a quarter turn, pull out and up.
²
REMOVAL OF LOWER FRONT PANEL C
(Access to refrigerant, hydraulic and
electrical connections)
Unscrew the two screws (c1 and c2),
pull out and up.
a1
b1
c1
9
A
a2
b2
1
2
B
c2
C