ADEMCO 5890PI Kurulum Talimatları - Sayfa 3

Güvenlik Sensörleri ADEMCO 5890PI için çevrimiçi göz atın veya pdf Kurulum Talimatları indirin. ADEMCO 5890PI 4 sayfaları. Passive infrared motion detector/transmitter

ADEMCO 5890PI Kurulum Talimatları
Figure 5. PC Board
TEST PROCEDURES
Important: Testing should be conducted with
the protected area cleared of all people. Place
the protective system's control in the Test
mode for the Walk-Test procedure. When the
PIR senses movement, a beep will be heard
To take full advantage of the pet immunity in the 5890PI, the following guidelines
should be followed:
Note: This unit will provide immunity to false alarms for an individual animal or a group of
animals whose total weight is equal to or less than 40 pounds when the room temperature is
above 50 F.
Trouble 1: INTERMITTENT ALARM
Probable Causes:
A. Rapid temperature change. Check for electric or gas
heaters, open flames, electric arcs, etc.
Remedy: Locate source and reposition detector.
B. Drafts causing drapes, light fixtures, display material to
move.
Remedy: Eliminate source of motion.
Trouble 2: LED INOPERATIVE DURING WALK-TEST
Probable Causes:
A. LED control jumper set to NORMAL.
Remedy: Reposition jumper to TEST position.
B. LED malfunction. Check for broken/shorted leads.
Remedy: Return unit for service.
from the system's console, verifying that the
PIR's transmitter signal has reached the
control's wireless receiver.
The absolute range of all PIR units is subject
to variation because of different types of
clothing,
temperature. For this reason, ensure that the
most likely intruder routes are well within
the PIR's protective zones and that Walk -
Testing is carried out along these routes.
Walk-Test
1. Remove front cover and set the pulse
count jumper in the detector in the OFF
position initially.
enabled at this time (jumper in the TEST
position).
2. Replace front cover and walk through
protective zones, observing that the
detector's LED lights whenever motion is
detected (the LED serves as a Walk-Test
indicator during this procedure).
3. If pulse count is going to be used in this
installation, set the pulse count jumper to
the ON setting and repeat the Walk-Test
procedure.
Note: If pulse count mode is used during
the Walk-Test, the LED will stay lit for
TABLE 1. INSTALLATION GUIDE FOR MOUNTING HEIGHTS
Lens
Part
Description/
No.
Coverage
5890PI
PET IMMUNE LENS
(Standard
35 ft x 45 ft
as installed)
(10.6m x 13.7m)
TABLE 2. SPECIAL INSTRUCTIONS FOR INSTALLATION WITH PETS
Mount the center of the detector 6-1/2 to 7-1/2 feet high and adjust the vertical angle
according to Table 1.
Set the Pulse Count to ON.
Mount where animals cannot come within six feet of the detector by climbing on furniture,
boxes, or other objects.
Do not aim the detector at stairways, furniture or objects that can be climbed by an animal.
backgrounds
and
ambient
The LED must be
Pulse
PIR
Count
Mounting Height
Req'd for
6.5 ft (2.0m)
installations
with pets
7 ft (2.1m)
7.5 ft (2.3m)
TRO UBLE S HO O TI NG
Trouble 3: DETECTION AREA CHANGES
Probable Causes:
A.
Repositioned furniture or equipment in the protected area.
Remedy: Caution customer about layout changes. Reposition
detector.
B.
Mounting surface is unstable. A few degrees of vertical shift can
change range substantially.
Remedy: Mount on secure surface.
Trouble 4: UNIT DOES NOT APPEAR TO BE OPERATING
Probable Cause:
A.
Unit is not receiving power.
Remedy:
Check for appropriate battery voltage. Install new
batteries if necessary. Be sure to change both batteries.
3
approximately 1 to 3 seconds after
detecting motion.
4. After the Walk-Test is completed, the
LED jumper should be placed in the
NORMAL position (LED disabled).
MAINTAINING PROPER OPERATION
In order to maintain the detector in proper
working condition, it is important that the
user observes the following:
1. Replace both batteries within 7 days
after a "low battery" message has
appeared in the system's display.
2. Detectors should never be re-aimed or
relocated without the advice or assistance
of the alarm service company.
3. The physical surroundings of the
protected area should not be changed. If
furniture or stock is moved, or air -
conditioning or additional heating is
installed, the PIR may have to be
readjusted.
4. Walk-Tests
should
be
frequently (at least weekly) to confirm
continued proper coverage.
† See Figure 5 for
Pattern
Setting
location of
(Deg)
adjustment scale on
PC board (refer also
+2
to "Vertical Pattern
Adjustment")
+1
.
+1
conducted
OPTIMUM PET
IMMUNITY