FITTING
Fig. 6 Clearance between pad halves
Fig. 7 Pad halves
13. Fitting bolts x4
3
3
Fig. 8 Fitting the pad half
3. Bolts
CA 150/152 W1080EN1
Distribute the clearance between the pad shells. This is
to ensure that the bolts fit properly.
Lubricate the four fitting bolts (13) and fit them with the
head upward in the outer positioned pads on both
sides.
Tighten the two pad halves together. Ensure that the
clearance is evenly distributed, about 25 mm (1"),
between the halves when you tighten the bolts (use tool
38 55 04 as a counter-support).
Drill two 18 mm (3/4") holes through the pad shell and
13
the drum shell. Fit the two M16 bolts.
Fit the two middle bolts (3) with the head upwards and
torque-tighten them (item 3 in drawing 38 53 45). Then
unscrew the outer fitting bolts and replace them with
M16x90.
When all four bolts are torque-tightened according to
drawing 38 53 45, reverse the machine half a turn of
the drum to gain access to the second joint. Repeat
according to the above.
Save the tool and the four tightening bolts for future
use.
Ensure that clearance is equal between the
pad shells. Use tool 38 55 04.
5