Galvin Engineering CliniLever TCWTJ150HC Ürün Kurulum Manualline - Sayfa 2
Banyo Armatürleri Galvin Engineering CliniLever TCWTJ150HC için çevrimiçi göz atın veya pdf Ürün Kurulum Manualline indirin. Galvin Engineering CliniLever TCWTJ150HC 4 sayfaları. Cp-bs hospital wall top assembly
Product Installation Guidelines
PRE-INSTALLATION
MOUNTING DETAILS
Wall body
− Wall body must be G5/8" FI and body should be between
0 and 13mm behind the finished wall surface.
TOOLS REQUIRED
−
Spanner and hex key
−
Thread tape
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions and
in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply
conditions must also comply to the applicable national and/or state standards. Failing to comply with these
provisions shall void the product warranty and may affect the performance of the product.
1. Fit spindle assembly
−
Remove handle and flange from spindle
assembly.
−
Ensure jumper valve and fibre washer are fitted
to spindle assembly.
−
Screw entire assembly into the wall body.
−
Fasten securely using a spanner.
© Galvin Engineering Pty Ltd
2. Fit wall flange
−
Ensure o-ring is fitted to the bottom of the wall
flange, and then hand-tighten the wall flange
onto the threaded sleeve.
Document No.: 001.00.10.18
Version 1, 4 November 2022, Page 2 of 4