AFL Hyperscale 20RU Kurulum Kılavuzu - Sayfa 17
Endüstriyel Ekipmanlar AFL Hyperscale 20RU için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. AFL Hyperscale 20RU 20 sayfaları. Mass-fusion splice cabinets
Standoff Bracket Assessory Installation
1.
Mark off the mounting holes holes using the
mounting plate as a guide.
3.
Insert the wall anchors (J).
20RU & 37RU Mass-Fusion Splice Cabinets
2.
Drill the mounting holes using 8mm (5/16")
drill bit.
4.
Mount the standoff brackets (N) with a screw
(I) and a washer.
© AFL Hyperscale. All rights reserved
17