3 LOCATION - GENERAL
3.11
3.12
3.13
3.14
3.15
3.16 Static inlet pressure: Ensure the static inlet head at the pump does not
exceed the values shown in the table under point 7.13.
3.17 Incoming mains water pressure: The incoming water pressure of at least
0.1 bar is required.
3.18 Ensure that location of the unit allows adequate space to give reasonable access
to all parts to accommodate service/commissioning.
3.19 Ambient temperature: The pump must be sited in a location where the
maximum ambient temperature does not exceed 40
3.20 Pipework: Pipework should be sized to ensure optimum performance of the
system.
3.21 Direction of flow: See Fig. 2 to identify the suction and discharge connections.
Access: For emergencies and maintenance the Mainsboost Charger
must be easily accessible.
Protection: The system must be located in a dry position, and
protected from freezing. Avoid environments which have a high
ambient temperature, high humidity or excessive condensation
and salt damage, etc.
Ventilation: Ensure an adequate air flow to cool the pump.
Separate the pump from other appliances that generate heat.
Safety: The motor casing can become very hot under normal
operating conditions. Care must be taken to ensure it cannot be
touched during operation.
Water retention: Site the pump in a location where in the unlikely
event of a water leak, any spillage is contained or routed to avoid
electrics or areas sensitive to water damage.
Fig. 2
- 7 -