360 YIELD CENTER 360 Y-DROP Montaj Talimatları Kılavuzu - Sayfa 7

Çiftlik Ekipmanları 360 YIELD CENTER 360 Y-DROP için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. 360 YIELD CENTER 360 Y-DROP 17 sayfaları. Case 80'/90' boom

7. 
Install z-bars and stop bolts in all 12 z-brackets, leave loose and
carefully fold sprayer booms into cradle to adjust fore/aft locations.
1. 
Twelve (12) 38" z-bars
2. 
Twelve (12) 5/16" x 3/4" stop bolts and nuts
8. 
Install 3" z-slider brackets and stop bolts on all z-bars, shown in FIG 5:
1. 
Twelve (12) 3" z-slider brackets
2. 
Twelve (12) 5/16" x 3/4" stop bolts and nuts
FIG   5  
9. 
Install and tighten 3/8" set screws with jam nuts in all z-slider
brackets, shown in FIG 6 (three per 6" z-slider, two per 3" z-slider):
1. 
(60) 3/8" set screws
2. 
(60) 3/8"jam nuts
 
3"   Z -­‐slider  
FIG   6  
3/8"   S et   S crew   &   n ut