5.
Secure the conduits outside the unit mechanically.
12. Connect the control cables
Make the connections according to the application. Keep the signal wire pairs twisted as near to the terminals as possible
to prevent inductive coupling.
1.
Remove the rubber grommets from the cable entry for the cables to be connected. Attach cable conduits to the empty
cable entry holes. Slide the cables through the cable conduits.
2.
Ground the shield at one end of the cable only. If you ground the shield at the source of the signal, do not ground it at
the SCR terminal.
3.
Tie all control cables to the provided cable tie mounts.
Default I/O connections (HVAC default configuration)t
Total load capacity of the auxiliary voltage output +24V (X2:10) is 6.0 W (250 mA / 24 V DC).
Terminals
+24V, DGND, DCOM, B+, A-, DGND, Ext. 24V
DI, AI, AO, AGND, RO, OUT, IN, SGND
Safe torque off (STO). Both circuits must be closed for
the drive to start. The drawing shows the simplified
connection of a safety circuit through safety contacts. If
STO is not used, leave the factory-installed jumpers in
place. See also section Safe torque off (STO).
R6... R9 only: Ext 24V AC/DC input to power up the
control unit when the main supply is disconnected.
Wire size
2
0.2 ... 2.5 mm
(24 ... 14 AWG)
2
0.14 ... 1.5 mm
(26 ... 16 AWG)
Tightening torque
0.5 ... 0.6 N·m (5 lbf·in)