Miller cineline 70 Operatör El Kitabı - Sayfa 7
Kamera Aksesuarları Miller cineline 70 için çevrimiçi göz atın veya pdf Operatör El Kitabı indirin. Miller cineline 70 17 sayfaları. Fluid head
Operating Instructions
2 Fluid Head Set-up (Tripod Bowl)
2.1 Ensure that the TRIPOD BOWL is approximately
horizontal. Place the Fluid Head into the TRIPOD BOWL,
adjust the BUBBLE LEVEL such that the bubble is inside
the black circle and tighten the CLAMP NUT.
Location Boss
7
4mm Hex Key
Threaded Stud
Mitchell Flat Base Adaptor
Location Slots
Tripod Bubble Level
Fig. 5