ABB ACS320 series Kurulum Talimatları - Sayfa 2
Kontrolör ABB ACS320 series için çevrimiçi göz atın veya pdf Kurulum Talimatları indirin. ABB ACS320 series 4 sayfaları. Variable frequency drives in renewaire ventilators
Ayrıca ABB ACS320 series için: Ek Kılavuz (16 sayfalar), Kurulum Talimatları (4 sayfalar)
8. Install the gland box cover.
9. Fasten the cover with two M4×12 screws.
13. ACS350 and ACS150 drives with MUL1-R1 option
installed.
ABB Oy Drives P.O. Box 184 FIN-00381 HELSINKI FINLAND Tel. +358 10 22 11, Fax: +358 10 22 22681, Internet: http://www.abb.com
10
8
9
10. Install the hood. First position the front edge carefully,
then press the hood downwards until it snaps on.
11
11. Fasten the hood to drive with two M3×12 screws.
12. Fasten the hood to wall with one M4 screw (not
included).
12