Alemite 3679 Servis Kılavuzu - Sayfa 3

Ölçüm Cihazları Alemite 3679 için çevrimiçi göz atın veya pdf Servis Kılavuzu indirin. Alemite 3679 12 sayfaları. Electronic meter

Electronic Meter

Installation

WARNING
Prior to installation, the following safety
precautions must be observed. Personal injury can
occur.
Do not exceed the pressure rating of any component
in the system.
Protect all fluid and air supply lines from puncture
or damage. Check all lines for weak or worn condi-
tions prior to use.
Never point a control valve at any portion of your
body or another person. Accidental discharge of
pressure and/or material can result in personal
injury.
Read each step of the instructions carefully. Make
sure a proper understanding is achieved before pro-
ceeding.
CAUTION
Install a 40-micron or finer filter at the inlet side of
this meter. Jammed gears, damage to components,
or inaccurate readings can occur.
Prior to meter installation, flush all contaminants by
pumping fluid through the system.
Apply thread sealant to all male pipe threads upon
installation.
Alemite, LLC

Maintenance

Release all pressure within the system prior to per-
forming any maintenance procedure.
Repairs should only be performed by a qualified person
using original repair parts.
Read each step of the instructions carefully. Make sure a
proper understanding is achieved before proceeding.
Battery Replacement
NOTE: All meter values remain in memory.
The batteries should be replaced once the battery icon appears on
the display. See Figure 1.
IMPORTANT: The meter will no longer register
should the battery icon begin to flash.
Recycle or discard the used batteries properly. Do
not burn or puncture the batteries. Toxic materials may be
emitted which can cause personal injury.
Avoid touching the flat surfaces of the new batteries. Skin
oils can cause battery deterioration. Clean any suspect bat-
tery with alcohol prior to installation.
Install the new Batteries as indicated on the bottom of the meter.
All values remain the same including the Current delivery.
Metering Gear Replacement
IMPORTANT: Install the gear with the magnets (mag-
nets upward) onto the left post of the body as shown
on Figure 2.
Install the additional gear perpendicular to the mag-
net gear. Rotate the gear assembly to ensure the gears
are properly positioned.
Changes Since Last Printing
Kit part number updated
3
WARNING
WARNING
CAUTION
Revision (5-10)
SER 3679