AluTeam BR 13x-3 Montaj Talimatları Kılavuzu - Sayfa 12
Kamyonlar AluTeam BR 13x-3 için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. AluTeam BR 13x-3 14 sayfaları. Box kits
Adapter
Suitable for motor vehicle type:
cable
MB Sprinter, VW Crafter, MAN TGE,
Opel Movano, Renault Master, Citro-
MA350158
en Jumper, Fiat Ducato,
MA350159
MA350168
Attention: Paints, solvents
and dusts endanger health.
Protect yourself!
Assembly instructions BR 133-3 to 139-3
Peugeot Boxer
Iveco Daily
Ford Transit
Fig. 396
Fig. 397
Fig. 398
Fig. 399
•
Pull out the connection cable for the interior lights at the bottom
of the left frame pillar and connect to the vehicle electrics.
Attention:
Follow the instructions of the vehicle manufacturers!
•
Pull out the connection cable for the navigation lights and, if ap-
propriate, the connection cable of the side marking lights at the
bottom of the right frame pillar. Connect these connection cables
to the adapter cable for the respective vehicle.
•
Connect the vehicle-specific adapter cable with the rear light
(Fig. 396).
•
Check the roof corners, doors and the lighting for tightness e.g. by
a water test for structures, following EN 283.
For this, direct a water jet from a ½" nozzle (Ø 12.5 mm inner di-
ameter) at a pressure of over 1 bar onto the external sealed joints.
Hold the nozzle at a distance of approx. 1.5 m from the structure.
After the test, no water should have penetrated into the structure.
•
You can generally paint over our coil coating and powder-coated
parts with traditional wet paints. For a secure adhesion, get in
touch with the paint supplier especially concerning the primer.
Untreated and zinc-coated profiles are to be treated with a suitable
primer before painting. The temperature in the painting cubicle
may not exceed 60°C.
•
Pay attention in particular to the corrosion protection in case of
subsequently attached component parts or modified AluTeam com-
ponents. In particular, you must absolutely exclude contact corro-
sion through different materials (Fig. 398). Otherwise the guaran-
tee on the painting, coating and bond is voided.
Note that the final strength of the sealant is reached, at the
earliest , after 24 hours (at 20°C). The assembled box can be treat-
ed but not loaded.
Attention:
You may only clean the structure with a steam
cleaner after 6 weeks. Please absolutely consider the
corresponding explanations under "4. Maintenance".
Stick-on labels related to the structure strength apply only in
connection with a certificate issued by AluTeam (Fig. 399).
Status 03/2022
Former instructions lose their validity.
12 / 14