Astronergy CHSM60M-HC Посібник з монтажу - Сторінка 2

Переглянути онлайн або завантажити pdf Посібник з монтажу для Блок управління Astronergy CHSM60M-HC. Astronergy CHSM60M-HC 12 сторінок. Crystalline silicon pv
Також для Astronergy CHSM60M-HC: Посібник з монтажу (12 сторінок), Посібник з монтажу (12 сторінок), Посібник з монтажу (18 сторінок), Посібник з монтажу (19 сторінок), Посібник (19 сторінок)

Astronergy CHSM60M-HC Посібник з монтажу
1. Introduction
1.1 Purpose
This document provides detailed instructions and valuable safety information regarding the
installation, electrical connection, and maintenance of following Chint Solar Crystalline Photovoltaic
modules:
CHSM6610M
CHSM6610P
CHSM6612M
CHSM6612P
All the instructions should be read and understood before installation. The installers should
be trained and conform to all safety precautions in this guide when installing the module. Keep
this guide in a safe place for further reference.
1.2 Limitation of Liability
Because the use of this manual and the conditions or methods of installation, operation, use
and maintenance of photovoltaic (PV) products are beyond Chint Solar
does not afford the responsibility and expressly disclaims liability for loss, damage, or expense
arising out of or in any way connected with such installation, operation, use or maintenance.
Chint Solar reserves the right to change the manual without prior notice.
1.3 Precautions of Installation
1.3.1
a) When the whole pallet of modules are delivered to the site and unloaded, make sure the
safety of the module especially if it needs to be lifted in the roof projects. Put it into the
protect device and then lift it to the roof in case of bumping against the wall during the lifting
process.
b) Firstly, tear the stretch film, then move away the top cover after cutting off each module
packing strip while unpacking. Two operators work as a group, grasp the module frame
tightly in the same direction and take out the module one by one. It is a must that the
operators rive the adhesive tape of the fixed module one by one, rive one piece and then
that the whole pack topples and falls down. The whole process must be taken very gently.
ide with any hard object or let any parts of the frame touch and drag on the ground.
CHSM6610M(BL)
CHSM6610M/HV CHSM60M-HC
CHSM6610P(BL)
CHSM6610P/HV
CHSM6612M/HV
CHSM72M-HC
CHSM6612P/HV
CHSM72P-HC
CHSM60P-HC
control, Chint Solar
adhesive tape one time in case