Dell Dell W- 620 Посібник з доповнення - Сторінка 11
Переглянути онлайн або завантажити pdf Посібник з доповнення для Перемикач Dell Dell W- 620. Dell Dell W- 620 42 сторінки. Controllers with arubaos fips firmware non-proprietary security policy fips 140-2 level 2 release supplement
Table 2 Media Eject Button LED Behavior
Initial State
NAS Media Operational
NAS Media Unmounted
Operational
Operating with NAS
Media un-mounted
Standby
In non-rack deployments, the Aruba 620 is placed with the front facing out. This allows the cables to be
hidden and creates a more aesthetically pleasing look. Therefore, a set of LEDs displaying link activity on
the ports is placed on the front side. Same LEDs also exist in back side too. For information about the
behavior of these LEDs, see table below.
Table 3 Aruba 620 LED Status Indicators
LED
Power
Status
10/100/1000Base-T Port
Aruba 620, 650 and Dell W-620, W-650 | FIPS 140-2 Level 2 Release Supplement
LED State
Action
Green-solid
Press and hold
media eject button
for 1 to 5 seconds
only
Amber-solid
Press and hold
media eject button
for 1 to 5 seconds
only
Green-solid
Press and hold
media eject button
for more than 5
seconds only
Amber-solid
Press and hold
media eject button
for more than 5
seconds only
Red-solid
Press media eject
button
Label
Function
POWER
Input Power Status Indicator
STATUS
Module Status Indicator
LNK/ACT
Link/Activity Status Indicator
1000
Interface Speed
Status LED
Function
Amber-flashing
Un-mount all NAS
media
Amber-flashing
Mount all attached
NAS devices, and
return to fully
functional
operation
Red-flashing
Controller goes
into Standby
Red-flashing
Controller goes
into Standby
Amber-flashing
Controller wake-up Green-solid
Indicator
On (Solid Green)
Off
On (Solid Green)
On (Solid Red)
On (Solid Amber)
Off
On (Solid Green)
On (Flashing Green)
Off
On (Solid Green)
Off
The Aruba 620 and 650 Mobility Controllers |
LED Action
Completed
Amber-solid
Green-solid
Red-solid
Red-solid
Status
Power on
No Power
Device is operational
Device failed or is in Standby
Device is loading software
No power
Link has been established
Port is transmitting or receiving
data
No link on port
1000 Mbps
10/100 Mbps
11