Aerial Assault Wakeboard Tower Посібник з монтажу - Сторінка 9
Переглянути онлайн або завантажити pdf Посібник з монтажу для Човнове спорядження Aerial Assault Wakeboard Tower. Aerial Assault Wakeboard Tower 13 сторінок.
STEP 8 - CONTINUED...
steP 9
SpLIT Lock wAShEr
SpLIT Lock wAShEr
STEP 10
9
m6 x 12mm
ThrEADED LAp joInT
SpLIT Lock wAShEr
m12 x 40mm
m12 x 45mm
m12 x 40mm
SpLIT Lock wAShEr
ThrEADED LAp joInT
m10 x 25mm
The side rails need to be mounted straight up and down. If
they are leaning in or out, this will cause a problem with the
tower when you want to fold it.
Assembling the Switch Blade (Rear Leg)
Start at the top of the switch blade and attach the trim
washer, shoulder bolt and threaded lap joint.
We recommend assemblying all the blade components
before installing the blade on the tower.
You will then need to attach the lower base to the thread-
ed lap joint. This is then followed by attaching the clamp
to the lower base (using the stainless steel socket head cap
screw.)
GUIDE#: pwb-ASSAULT-004