Ambirad Vision VSX Handbuch für Instandhaltung und Inbetriebnahme - Seite 12

Blättern Sie online oder laden Sie pdf Handbuch für Instandhaltung und Inbetriebnahme für Elektrischer Heizer Ambirad Vision VSX herunter. Ambirad Vision VSX 14 Seiten. Radiant tube heaters

6. Replacing Parts.

6.1 Burner Controller Replacement
Step 1 Slacken screw in burner lid and open the
right hand burner access door.
Step 2 Disconnect burner controller from the
wiring harness.
Step 3 Disconnect the HT Lead from burner
controller
Step 4 Remove the two screws attaching the
controller to the burner and remove.
Step 5 Fit new burner controller
Step 6 Refit HT leads and refit burner controller
to wiring harness.
Step 7 Test product and close access doors.
6.2 Air Pressure Switch Replacement
Step 1 Disconnect the two silicone impulse
tubes and three wiring connections making note
of replacement positions.
Step 2 Remove the two screws as shown below.
Step 3 The air pressure switch can now be
removed.
Step 4 Fit the new air pressure switch ensuring
the impulse tubes are connected as shown
below.
Step 5 Test product and close access doors.
12