Ambu aBox 2 Ersatz-Handbuch - Seite 8
Blättern Sie online oder laden Sie pdf Ersatz-Handbuch für Medizinische Ausrüstung Ambu aBox 2 herunter. Ambu aBox 2 16 Seiten.
Spare Part
Thickness: 4 pt
1.6. Spare Part Replacement Process
This section specifies a spare part replacement process which is in compliance with IEC 62353.
Read these Instructions for Use carefully before performing any replacements on the Ambu®
aBox™ 2.
The technician and personnel being responsible for the replacement process should fulfil the
requirements outlined in section 1.1.
Follow the process in Figure 2 to replace spare parts in the displaying unit.
Use the Trouble
Shooting guide in
the IFU
Chapter 2:
Clean and disinfect
the displaying unit
8
Description
Ambu® aBox™ 2 -Visualization
device interface kit - Grey-Empty-
Green
Contains:
One grey and one green visualization
device interface board (VDI), a front
cover with a colour ring (grey and
green), a plectrum tool, and two
screws for the VDI.
Power cables - J (CH), K (DK), I (AUS/NZ)
Power cable - B (US, JP)
Power cables - G (UK), E/F (EU, not DK,
CH)
Contact Ambu, if
you need further
assistance
Chapter 4:
Replace the
relevant part(s) of
the displaying unit
Follow the standard operating procedures
required by your organization
Figure 2 Spare part replacement flow
Order and receive
relevant parts to be
Chapter 5:
Chapter 2:
Inspect the
Clean and disinfect
displaying unit
the displaying unit
Item numbers
505000530
505000520
505000521
505000522
replaced.