Aktobis WDH-GH20R Wichtige Sicherheitshinweise Handbuch - Seite 3
Blättern Sie online oder laden Sie pdf Wichtige Sicherheitshinweise Handbuch für Heizgerät Aktobis WDH-GH20R herunter. Aktobis WDH-GH20R 10 Seiten. Glass panel heater
Please switch off the unit immediately and disconnect it from the mains/power
supply if anything seems to be wrong !!! In this case, please contact a specialist
and do not attempt to repair the unit yourself !!!
Example: Fuse has blown.
Mounting the feet:
Before you use the heater as a free-standing unit for the
first time, it is absolutely necessary to screw the
supplied feet onto the unit. To do this, take the two
plastic feet and screw them to the bottom of the unit with
four (4) screws each.
Wall mounting:
If you do not want to use the heater free-standing, but prefer to mount it on the wall, you
can easily do this with the accessories supplied as follows:
Note: Do not mount in front of a socket, under a shelf, a curtain or under other objects !
First loosen/remove the wall bracket at the back of your
heater as follows:
1.
Open the locking hook (see diagram).
2.
Now you can pull the complete bracket downwards with
a little force and thus detach the wall bracket from the
heater.
Now you can use the wall bracket as a template to mark
your four drill holes. Make sure that the heater hangs on the
wall at a distance of at least 15 cm from the floor and at
least 50 cm from the ceiling:
1.
Use the correct wall plugs/screws according to the wall condition and then fix the
dehumidifier with the wall bracket to the intended wall (see following diagram).
Aktobis AG, Borsigstr. 20, D-63110 Rodgau / Germany
www.AKTOBIS.de
Email: [email protected]
Locking hook