Euro Towers Podium 3 Handbuch - Seite 2

Blättern Sie online oder laden Sie pdf Handbuch für Baumaschinen Euro Towers Podium 3 herunter. Euro Towers Podium 3 2 Seiten. Stepfold swing gate

STEPFOLD PODIUM 3 SWING GATE
Assembly Instructions
Kit List - Podium 3
Open the unit on a firm
Fit the main platform on
and level base, lock the
the 8th rung as shown.
folding section.
Fit the step platform at
Fit stabilizers on both
the base of the unit as
sides of the unit.
shown.
Always work on the podium with the folding gate facing the work area
When leaving the podium, always descend facing the folding gate
Manufactured to a TUV certified ISO 9001:2015 Quality Control System
Ensure that the castors
Fit a diagonal brace from
are in the braked
the 1st to the 4th rung of
position.
the podium at the back of
the unit.
Please Note: To remove
Access the platform using
the ladder, release the
the step platform and
bottom catches and turn
ladder, keeping 3 points
the hooks towards you.
of contact with the unit at
This will enable the top to
all times.
be removed.
Certified to BS 8620 standard
Repeat this process on
Fit the ladder 1 rung below
the front of the unit in
the working platform. Pivot the
the opposite direction as
rung until the hook is facing
shown.
downwards and clip into place.