Euro Towers SPO829 Montageanleitung Handbuch - Seite 3

Blättern Sie online oder laden Sie pdf Montageanleitung Handbuch für Leitern Euro Towers SPO829 herunter. Euro Towers SPO829 10 Seiten. 232 - 2.34 x 0.5 x 1.5m narrow tower

232 - 2.34 x 0.5 x 2.0m Narrow Tower - Assembly Instructions
232 - 2.34 x 0.5 x 1.5m Narrow Tower– Assembly Instructions
Please read before using this equipment
2 people are required to build this equipment safely.
Ensure all parts are present & not damaged before assembling.
Risk assessments shall be done before commencing any work.
In accordance to the Working At Height Regulations, particular attention should be paid to Guardrails.
1. Do not use on unstable ground such as loose bricks, boxes or blocks.
2. Remove all personnel & materials before moving or dismantling the unit.
3. If the unit has been moved, ensure the unit is levelled and all fittings are tight before re-using it.
4. Do not gain extra height by using boxes, ladders etc on the platform.
5. Do not overload the unit.
6. Do not overreach out of the unit
7. This equipment should be inspected by a competent person before & after any alteration (moving, partial disassembly etc.)
8. Euro Towers recommend the use of protective gloves when assembling and disassembling
INS–SPO829 Dec 2022
Page 3 of 10