American Standard Acrylux Builder 6030Y1.102 Series Einbauanleitung - Seite 2

Blättern Sie online oder laden Sie pdf Einbauanleitung für Badewannen American Standard Acrylux Builder 6030Y1.102 Series herunter. American Standard Acrylux Builder 6030Y1.102 Series 3 Seiten. American standard acrylux builder series bathtubs installation instructions

INSTALLATION INSTRUCTIONS
STEP 1. PREPARING ALCOVE
• Strip to bare studs.
• Alcove studs should be constructed as shown above.
• Floor must be clean, smooth, and level (check with level). Sub
floor must be installed. Do not install tub on open floor joists.
• Cut hole in sub floor as shown on page 1 to accommodate drain.
STEP 2. INSTALLING TUB
• Trial fit tub in prepared alcove. With tub sitting flat on floor, check
with level on top of tub. Tub should be level from front-to-back
and side-to-side (Fig 1).
• A floor leveling compound (smooth mortar) or a similar
quick-setting compound specifically made for leveling floors may
be used to fully support and level base.
• After tub is leveled, if alcove is larger than tub, shim between tub
and studs to create a tight fit. Screw tub flange to studs (Fig. 2).
CLEANING
• Do not use any abrasive cleaners or metal scrapers.
• If drywall mud or plaster gets on your shower, it may be carefully removed with a wooden scraper made from
a piece of scrap wood.
• Adhesive may be removed with mineral spirits.
• Ideal cleaners are Soft Scrub Gel
WARNING:
Some cleaning products are not suitable for use. Read all labels carefully.
DO NOT USE if they say "not suitable for use with ABS, acrylic, or polystyrene.
®
®
or Comet Gel
.
- 2-
FIGURE 1. Check to assure tub is level.
FIGURE 2. If necessary, shim between tub and studs for
tight fit and screw to each stud.
75428 1 -1 0 0 Re v. A