American Standard Green Tea 3575 Installationshandbuch - Seite 10
Blättern Sie online oder laden Sie pdf Installationshandbuch für Badewannen American Standard Green Tea 3575 herunter. American Standard Green Tea 3575 17 Seiten. American standard bathing pool installation guide
![American Standard Green Tea 3575 Installationshandbuch](/uploads/products/server2/1117660/1117660.jpg)
DRAIN CONNECTION
1. Remove and identify all drain components as defined in air bath drain illustration.
2. Find 1" schedule 40 PVC pipe, see pipe chart, HORIZONTAL DRAIN PIPE.
Mark as "horizontal pipe", drain to elbow section.
3. Find 1" schedule 40 PVC pipe, see pipe chart, VERTICAL DRAIN PIPE.
Mark as "vertical pipe", drain to elbow section.
4. Install drain from below unit through opening as shown in photo A.
A.
5. Apply 3 or 4 pea sized dabs of 100% silicone sealant to bottom waste drain flange and press flat rubber gasket into place
as shown in photos B and C.
B.
6. Apply 1/" continuous bead of 100% silicone sealant to flat rubber gasket as shown in photo D. Set aside and be sure not to
disturb silicone bead.
D.
7. Apply 1/" continuous bead of 100% silicone sealant to back side to metal strainer as shown in photo E. Press
Strainer retaining bolt into metal strainer and insert into drain hole of acrylic bath.
E.
754063-100 Rev. B
MODEL
C.
10
PIPE CHART
VERTICAL
HORIZONTAL
PIPE
74
10.50"
74
1.00"
70
11.00"
3571
1.75"
357
1.50"
3573
1.75"
3574
1.5"
3575
1.50"
PIPE
6.50"
6.50"
4.75"
5.75"
6.00"
5.75"
5.75"
5.75"