American Standard 2779 Einbauanleitung

Blättern Sie online oder laden Sie pdf Einbauanleitung für Toiletten American Standard 2779 herunter. American Standard 2779 4 Seiten. Dual flush 2-piece toilet
Auch für American Standard 2779: Montageanleitung Pflege und Wartung (13 seiten)

American Standard 2779 Einbauanleitung
INSTALLATION INSTRUCTIONS
CARE AND MAINTENANCE
FloWise™ DUAL FLUSH 2-PIECE TOILET
Normal Height, Elongated Rim: 2479 / 2476 / 2779
Right Height™ Elongated Rim: 2480 / 2484 / 2778 / 2566
Normal Height, Round Front: 2489
Thank you for selecting American Standard - the benchmark of fine quality for over 100 years. To ensure this product is installed
properly, please read these instructions carefully before you begin. (Certain installations may require professional help.) Also be
sure your installation conforms to local codes.
CAUTION: PRODUCT IS FRAGILE. TO AVOID BREAKAGE AND POSSIBLE INJURY HANDLE WITH CARE!
!
NOTE: Pictures may not exactly define contour of china and components.
RECOMMENDED TOOLS AND MATERIALS
Putty Knife
Regular Screwdriver
Hacksaw
Wax Ring/Gasket
1
REMOVE OLD TOILET
a. Close toilet supply valve and flush tank completely. Towel or sponge remaining water from tank and bowl.
b. Disconnect and remove supply line.
NOTE: If replacing valve, first shut off main water supply!
c. Remove old mounting hardware, remove toilet and plug floor waste opening to prevent escaping sewer gases.
d. Remove closet bolts from flange and clean away old wax, putty, etc. from base area.
NOTE: Mounting surface must be clean and level before new toilet is installed!
2
ROUGHING-IN DIMENSIONS:
MODELS:
2479
2476
2779
2480
2484
2778
2566
2489
3
CLOSET
FLANGE
A
CLOSET
BOLTS
INSTALL CLOSET BOLTS
Install closet bolts in flange channel,
turn 90°, and slide into place 6"
(152mm) apart and parallel to wall.
TEMPORARILY set toilet in place.
Place tapered washer and nuts onto
the bolts as shown in Step 5. Mark bolt
length needed for bolt cap clearance.
Remove toilet. Precut the bolts to
length by twisting the nut onto the bolt
past the cut mark, then cutting the bolt
to the desired length with a hacksaw.
Unscrew the nut to repair the threads.
Re-install bolts in flange.
P r o d u c t n a m e s l i s t e d h e r e i n a r e t r a d e m a r k s o f A S A m e r i c a I n c .
© A S A m e r i c a I n c . 2 0 0 9
Adjustable Wrench
Flexible Supply Tube
DIMENSION A:
12"
(305 mm)
4
SEALANT
INSTALL WAX SEAL
Invert toilet on floor (cushion to
prevent damage), and install wax
ring evenly around waste flange
(horn), with tapered end of ring
facing toilet. Apply a thin bead of
sealant around toilet base.
Sealant
Closet Bolts
FINISHED WALL
A
FINISHED FLOOR
5
WAX RING
POSITION TOILET ON FLANGE
a. Unplug floor waste opening and install toilet on closet flange
so bolts project through mounting holes.
b. Loosely install retainer washers and nuts. Side of washers
marked "THIS SIDE UP" must face up!
Certified by
IAPMO R&T
Tape Measure
Carpenters Level
C/L
SUPPLY
AS
REQUIRED
BOLT
CAP
NUT
TAPERED
WASHER
CLOSET
BOLT
FLANGE
7301144 -1 0 0 Re v. H