Da-Lite ADVANTAGE DELUXE ELECTROL Gebrauchsanweisung - Seite 2

Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Projektor-Zubehör Da-Lite ADVANTAGE DELUXE ELECTROL herunter. Da-Lite ADVANTAGE DELUXE ELECTROL 12 Seiten. Automatic electric projection screen
Auch für Da-Lite ADVANTAGE DELUXE ELECTROL: Spezifikation (2 seiten), Gebrauchsanweisung (12 seiten), Spezifikationsdaten (2 seiten), Gebrauchsanweisung (12 seiten), Gebrauchsanweisung (9 seiten), Gebrauchsanweisung (8 seiten)

Da-Lite ADVANTAGE DELUXE ELECTROL Gebrauchsanweisung

Important Safety Instructions

When using your video equipment, basic safety precautions
should always be followed, including the following:
1.
Read and understand all instructions before using.
2. Position the cord so that it will not be tripped over, pulled,
or contact hot surfaces.
3. If an extension cord is necessary, a cord with a current rating
at least equal to that of the appliance should be used. Cords
rated for less amperage than the appliance may overheat.
4. To reduce the risk of electric shock, do not disassemble this
appliance. Contact an authorized service dealer when repair
work is required. Incorrect reassembly can cause electric
shock when the appliance is used subsequently.
5. The use of an accessory attachment not recommended by
the manufacturer may cause a risk of fire, electric shock,
or injury to persons.
Save These Instructions
2

Pre-Installation

1. Carefully unpack screen and remove outer wrapping
from case.
2. Make sure to recheck measurements of screen location
before installation.
Screw For
Securing Roller
Access Door
Fabric Door

Case Installation

1. The case provides multiple attachment points for bolts,
cables, or threaded rod. Page 8 shows threaded rod installed.
The variable position-mounting bracket may be located
anywhere along the length of the case. It is recommended
to keep the brackets spaced evenly enough to distribute the
weight of the screen.
The case has a self-trimming flange around the bottom.
Ceiling tiles or drywall may be placed on top of this flange
to provide a finished appearance.
2. After securing the case in the ceiling check that the case
is level and plumb.
3. Install electrical connections that apply to your unit. Refer to
the following diagrams for proper installation. The diagrams
on page 5 are for standard controls; the diagrams on page 6
are for SCB100 controls and page 7 for SCB200 controls. The
terminal block for the wall switch connections is located
under the metal housing surrounding the junction box.
Remove two screws for access.
Access
Door
Figure 1